Project management templates

Build a RACI chart, rate risks on a 5 by 5 matrix, and fill in six project templates to copy or print. Every example is made up. Free, nothing you type is saved or sent, no sign-up needed.

  • RACI chart builder
  • Risk matrix and register
  • Six templates
  • No sign-up needed

CollegeCompass360 is an independent education resource. We are not a school, a testing company or a government agency.

Part 1 · RACI chart builder

RACI chart: build yours

A RACI chart lists the tasks down the side and the people or roles across the top, then puts one letter where they meet. The chart below is a made-up volunteer project. Change any name, then pick a letter in each box.

R · Responsible
Does the work to complete the task. Every task needs at least one.
A · Accountable
Answerable for the task being done correctly, and signs off on it. Some project-management theories say each task has only one.
C · Consulted
Gives input before the work is finished, such as a subject expert. Communication runs both ways.
I · Informed
Kept up to date on progress, sometimes only at the end. Communication runs one way.

Use A/R when one person is both Accountable and Responsible, which is common on small tasks. Some teams add a letter. RASCI adds Support, and DACI swaps the roles for Driver, Approvers, Contributors and Informed.

RACI chart: tasks in rows, roles in columns
Task
Remove row

Every task has one Accountable and at least one Responsible.

Nothing you type is saved or sent. Copy or print before you leave the page.

Part 2 · Risk matrix and register

Risk assessment matrix and risk register

A risk matrix is a grid that rates a risk by combining how likely it is with how severe it would be. A risk register is the list behind it. Rate each made-up risk below and the matrix and the ranking update.

1Minor2Small3Moderate4Major5Severe
5Almost certain5Moderate10High15Very high20Very high25Very high
4Likely4Low8Moderate1 risk12High16Very high20Very high
3Possible3Low6Moderate9Moderate1 risk12High15Very high
2Unlikely2Low4Low6Moderate8Moderate1 risk10High
1Rare1Low2Low3Low4Low5Moderate

Score = likelihood times impact, from 1 to 25. The bands (Low 1 to 4, Moderate 5 to 9, High 10 to 14, Very high 15 to 25) and the one-to-five labels are an example for learning. Your organization sets its own scales. Matrices are a rough ranking tool: different risks can land on the same score.

  1. Fewer than ten volunteers sign up9 · Moderate
  2. Hall booking falls through8 · Moderate
  3. Rain on the day of the outdoor tour8 · Moderate
Risk 1

Score 8 · Moderate

Risk 2

Score 9 · Moderate

Risk 3

Score 8 · Moderate

Response words used here: Avoid (change the plan so the risk cannot happen), Reduce (make it less likely or less severe), Transfer (move the impact to someone else, such as through insurance) and Accept (carry on and deal with it if it happens).

Free bonus

Unlock the bonus, free

Part 3 · Fill-in templates

Six project templates to fill in

Pick a template, type into the boxes, then copy the text or print the sheet. Leave boxes empty to print a blank form. Nothing you type is saved or sent.

Communication plan

Who needs to hear what, how, how often and from whom. One row per message.

Communication plan

Example row: Progress update | Sponsor | Show where we stand | Weekly | Project lead | Short email

Part 4 · Roles

What is a Scrum Master?

A Scrum Master is the person accountable for establishing Scrum as the Scrum Guide defines it, and for the Scrum team’s effectiveness. The guide calls Scrum Masters true leaders who serve the team and the larger organization.

For the team

  • Coaches team members in self-management and working across skills
  • Helps the team focus on valuable work that meets its Definition of Done
  • Causes obstacles to the team’s progress to be removed
  • Makes sure Scrum events take place, stay positive and productive, and stay within their time limit

For the Product Owner

  • Helps find ways to define the product goal and manage the backlog
  • Helps the team see why backlog items should be clear and concise
  • Facilitates stakeholder collaboration when asked or needed

For the organization

  • Leads, trains and coaches the organization in adopting Scrum
  • Plans and advises Scrum rollouts
  • Removes barriers between stakeholders and Scrum teams

A Scrum Master is a role on a Scrum team, not a manager of it. The Scrum Guide is the source for the lists above; read the guide itself for the full wording.

Part 5 · Practice questions

Ten practice questions

One question at a time, each answer explained. Your score is free and needs no sign-up.

Question 1 of 10

In a RACI chart, what does the Accountable person do?

Free bonus

Unlock three printable sheets, free

  • A blank RACI chart, ten tasks by six roles, to print and fill in by hand
  • A blank risk register with the 5 by 5 matrix on the same page
  • A twelve-question project kickoff checklist

Bonus

Three blank sheets to print

Locked until you enter your email in the box above

  • Blank RACI chart

    Ten task rows and six role columns, with the four letters explained at the bottom.

  • Blank risk register and 5 by 5 matrix

    The ten-row register and the matrix on one page, with the score bands written on it.

  • Project kickoff checklist

    Twelve questions to answer before work starts: scope, roles, risks, communication and how success is checked.

Everything above this box stays free: the RACI builder, the risk matrix and register, the six templates and the practice questions.

Sources

Where the facts come from

Written in our own words from these public pages. Your workplace or course may use different scales, letters or layouts; follow them over these examples.

More free tools: workplace communication and business letter format.

Questions

Common questions

A table with tasks in the rows and people or roles in the columns. Each box holds one letter: R for Responsible (does the work), A for Accountable (answerable for it and signs off), C for Consulted (gives input, two-way) or I for Informed (kept up to date, one-way). It is also called a responsibility assignment matrix.

Some project-management theories say exactly one per task or deliverable, and the builder on this page checks for that. Every task also needs at least one Responsible person. When one person does both, write A/R.

A grid that rates a risk by combining how likely it is with how severe its consequences would be. Common sizes are 3 by 3, 4 by 4 and 5 by 5. It is a quick way to see which risks to look at first, but it is a rough ranking: different risks can get the same rating, and the labels are subjective.

A typical register lists each risk with its likelihood and impact ratings, a score (often likelihood times impact) used to rank them, what you will do about it, a trigger that tells you it is happening, and an owner. The builder in Part 2 uses those columns.

A corrective action removes the cause of a problem that has already happened so it does not come back. A preventive action is taken before a problem happens, usually because a risk review pointed to it. The corrective action template asks for the root cause and for how you will check the fix worked.

No. Everything stays in your browser until you leave the page. Copy the text into your own document or print before you close the tab. The only thing you can send from this page is the email address for the bonus, if you choose to enter it.

Yes. The RACI builder, the risk matrix and register, the six templates, the Scrum Master explainer and the practice questions need no sign-up. An email unlocks three blank printable sheets, which open on this page right away and stay open on this browser.